After checking on the frame in the morning, I found a problem. The starboard mast support appeared to have lifted from the plywood over night. What had actually happened was the opposite. We have been glueing on top of the stack of plywood with out issue, but having but out the bunk sides prior to joining them together, the ply no longer offered a level surface. The weight applied to the top of the frames had bent it round slightly and so a void had formed between the ply and mast support. 

Fortunately the resin hadn't worked its magic yet and so it was a simple process of raising the temperature with the heat gun and heater, and slowly slowly lifting it with wedges. 

Cleaning off the half-cured epoxy took a while, then changed the position of the panel, and stuck the mast support back on. 

Laminated the knee too.

Freddie