Frames B, E & D

 11/01/2021

No dramas for the second set of frames. I waited until the weather changed over night to the south-west and ended the week of hard frosts. B and E I did by myself and so was appreciative of the the slow-hardener and still mild temperatures, allowing for quite a long pot-life of the epoxy. This allowed plenty of time to get all the measurements accurate before screwing in the gussets, clamping and weighing down. 

Pelham was free to help in the afternoon with frame D which made all much smoother and the tape measure, drill and driver managed to stay free from resin.

Freddie







Comments

Popular posts from this blog

All Fair and Prime

Stringers on Frames

Planking